Skip to main content
DCHCMPO Logo
File #: 14-199    Version: Name:
Type: Plan/Study Status: Passed
File created: 12/15/2014 In control: Triangle West TPO Board
On agenda: 3/11/2015 Final action: 3/11/2015
Title: Congestion Management Process (CMP) - System Status Report 2014 (9:30-9:45) Andy Henry, LPA Staff
Attachments: 1. 2015-03-11 CMP Status System Report, 2. 2015-02-25 Final CMP Status System Report, 3. Att 08 - draft CMP Status System Report 2014 (Full Report) 12-10-2014, 4. Att 09 - CMP System Report, 5. Att 09A - CMP Status System Report 2014 (Full Report)
Title
Congestion Management Process (CMP) - System Status Report 2014 (9:30-9:45)
Andy Henry, LPA Staff
 
Narrative
The Congestion Management Process (CMP) System Status report was developed in accordance with federal regulations and the CMP Procedures and Responsibilities that the MPO adopted in June 2011. This report provides the state of system performance, recommendations and future directions.  The MPO Board released the report at their January 14th meeting for a 21-day public review and comment period.  MPO staff received several comments from local staff but did not receive any comments from the public.  Based on those comments, the most significant changes made for the final report include:
·      Appropriately designated the recommended CMP projects that are funded in the draft FY2016-2025 State Transportation Improvement Program (STIP);
·      Renamed the walkability measure to the more appropriate term "walk score;"
·      Reformatted Table 3, Regional Performance Measures, to group together those measures that can be compared to population change;
·      The comparison of peak and off-peak congestion travel times have been updated, resulting in I-40 (Durham) having the highest percentage of additional peak travel time.
 
Attachment Item #10 is the final CMP System Status report.
 
Recommendation
TC Recommendation:  Review final report and recommend that the MPO Board adopt it.
 
Board Action
Board Action:  Review and adopt final report.